LOT# added to completed manufacturing jobs

It is proposed to add a lot number to the completed BOM SKU (manufacturing jobs). A simple solution would be to use the manufacturing job ID as the BOM SKU LOT number. By doing this, you will be able to easily retrieve the BOM SKU that was completed, along with the original lot numbers of all the items that were involved in manufacturing. Another option would be to add the LOT# at the time the manufacturing process configuration is done.